APC AP7921 Manual de instalación Pagina 8

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 24
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 7
Install the Switched Rack PDU
4 Switched Rack PDU Installation and Quick-Start Manual
Install in an enclosure or
rack
You can mount the Switched Rack PDU in a 19-inch NetShelter
®
enclosure or rack or other EIA-310-D standard 19-inch rack. To install
the PDU in a NetShelter enclosure:
1. Choose a mounting position for the PDU with either the display or
the rear facing out of the enclosure.
2. Attach the mounting brackets to the PDU, using the flat-head
screws (provided).
3. Choose a location for the unit:
Note
The unit occupies one U-space. A notched hole on the
enclosures vertical rail indicates the middle of a U-space.
19
1 U
20
21
Vista de pagina 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 23 24

Comentarios a estos manuales

Sin comentarios