APC PDRPPNX10-M Especificaciones Pagina 19

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 48
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 18
Installation Procedures: Connect Utility Conductors to the PDU
InfraStruXure System - Installation and Start-Up 15
For overhead wiring: Remove the user connection plate from the top of the PDU.
2. Cut an appropriately-sized hole in the gland plate for the conduit.
3. Re-attach the gland plate.
4. Install a lock-nut and bushing to the conduit.
5. Thread the conduit through the hole.
Install a circuit breaker
Warning: When you connect the InfraStruXure PDU to utility, you must install a circuit
breaker to protect the PDU against over-current.
Determine the amperage of the circuit breaker that you need to install:
Input Voltage Circuit Breaker Amperage
208V 175A
480V 80A
600V 60A
Vista de pagina 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 47 48

Comentarios a estos manuales

Sin comentarios