APC MGE Galaxy 3500 Extended Run Frame Especificaciones Pagina 17

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 32
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 16
13MGE™ Galaxy™ 3500 10-40 kVA 380/400/415 V, 10-30 kVA 208/220 V Battery Installation
523 mm (20.59 in) UPS system with the UPS placed to the right (seen from the front).
1. Install the following baying kit busbars between the UPS and XR1:
880-1607 between the vertical busbar N on the UPS and busbar 3 on XR1
880-1605 between vertical busbar (+) on the UPS and busbar 1 on XR1
880-1606 between vertical busbar (-) on the UPS and busbar 6 on XR1
2. Install the following baying kit busbars between the two XR Battery Enclosures:
880-0926 between the vertical busbar 4 on XR1 and vertical busbar 3 on XR2
880-0941 between the vertical busbar 2 on XR 1 and vertical busbar 2 on XR2
880-0940 between the vertical busbar 5 on XR1 and vertical busbar 5 on XR2
N
+
XR2
XR1
UPS
Vista de pagina 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 31 32

Comentarios a estos manuales

Sin comentarios