APC PD40G6FK1-M Manual de instrucciones Pagina 14

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 16
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 13
2. Verify that the EPO DIP switches on the PDU monitoring unit are configured properly for the signal type
you are using. The labels above the switches and the figure below show the correct settings for both the
Normally Open (NO) and Normally Closed (NC) position.
Note: The default setting on the EPO interface on the PDU monitoring unit is for a Normally Open
(NO) switch.
For information on testing the EPO switch, see the 40kW InfraStruXure PDU Operation and
Configuration manual.
pdx0205a
Location of switches
on PDU monitoring unit
Vista de pagina 13
1 2 ... 9 10 11 12 13 14 15 16

Comentarios a estos manuales

Sin comentarios