2. Verify that the EPO DIP switches on the PDU monitoring unit are configured properly for the signal type
you are using. The labels above the switches and the figure below show the correct settings for both the
Normally Open (NO) and Normally Closed (NC) position.
Note: The default setting on the EPO interface on the PDU monitoring unit is for a Normally Open
(NO) switch.
For information on testing the EPO switch, see the 40kW InfraStruXure PDU Operation and
Configuration manual.
Comentarios a estos manuales