InRow RD Operation and Maintenance4
Electrical Inspection Checklist
The electrical inspection verifies that all electrical connections are secure and correct and that the
equipment is properly grounded.
Electrical Hazard: All electrical wiring must comply with local and national codes and
regulations.
Electrical Hazard: The equipment must be grounded (do not use a water-pipe ground).
Electrical Hazard: Three-phase electrical service (plus ground) is required.
Ensure that the:
Incoming voltages match the phase and voltage listing on the nameplate.
Electrical wiring complies with local and national codes and regulations.
Equipment is properly grounded.
Front door is properly grounded.
Electrical connections are tight, including contactors, terminal blocks, controllers, switches, relays,
auxiliary devices, and field connections.
Circuit breakers are properly connected and securely attached to the DIN rail.