APC Network Management Card AP9619 Manual de usuario Pagina 24

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 34
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 23
Load Connection – Restart Procedure
20 Smart-UPS® VT ISX 20-30 kVA, 208/220/480V Operation 990-2819
Set the applicable breaker to the OFF position (make a note of which outlet supplies which
load).
Insert the plug from the load into the outlet. Secure the plug by turning it clockwise
approximately 45°.
Set the applicable breaker to the ON position to supply the load.
Disconnecting the load from the PDU(s)
To disconnect the load, set the applicable breaker, or breaker unit, to the OFF position.
Note
The UPS can support a 3-phase load if that load is connected to the 3-phase terminal in
order to ensure correct connection/disconnection of the load across all 3 phases
simultaneously.
Note
ONLY single-phased Phase to Neutral loads may be connected to the five L21-20
outlets as per NEC05. The outlets have individual breakers for each phase for
maximum availability.
Vista de pagina 23
1 2 ... 19 20 21 22 23 24 25 26 27 28 29 ... 33 34

Comentarios a estos manuales

Sin comentarios