APC RAID Subsystem SCSI-SATA II Especificaciones Pagina 77

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 100
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 76
Falcon 24 Bay SCSI-SATA Installation and Hardware Reference Manual
Figure 5-7: Removing the PSU Retention Screw
Step 3. Remove the failed module using the retention handle. Press the
retention handle down until the PSU is released from the enclosure
chassis. (See Figure 5-8)
Figure 5-8: Dislodging the PSU
Step 4. Gently pull the PSU module out of the chassis using the retention
handle.
Step 5. Insert the new PSU module into the slot with the retention handle at
its lowest position. Push the PSU in until you feel the contact
resistance with its back-end connectors. Do not use force or slam the
5-12 Replacing a Failed PSU Module
Vista de pagina 76
1 2 ... 72 73 74 75 76 77 78 79 80 81 82 ... 99 100

Comentarios a estos manuales

Sin comentarios